This 1950s Salvation Army facility had outgrown its limited office space. The challenge was to build an addition that complemented the original structure while making the most of a very limited amount of actual site space. The result was this concrete slab-on-grade addition with masonry block structural walls and brick face, steel roof trusses and deck, and anodized aluminum windows.