This
1950s Salvation Army facility had
outgrown its limited office space.
The challenge was to build an addition
that complemented the original structure
while making the most of a very limited
amount of actual site space. The result
was this concrete slab-on-grade addition
with masonry block structural walls
and brick face, steel roof trusses
and deck, and anodized aluminum windows.
|